November 15, 2010
welcome to my home 4
hi.
today i want to introduce you my newly renovated bathroom.
before having moved in this home, i strongly felt the necessity of the renovation for the bathroom on the main floor.
unfortunately we didn't have time to do that before the moving-in, we had to do that after we moved in in the middle of october.
it took about 10 days to be completed, and we did that by ourselves with my kind friend's help.
i really appreciate his kind help and skilled ability.
=before=
these 2 photos taken by my husband while we were still searching our new home to be are "good" before photos.
this space is so narrow, and he used one of his widest, 18mm lens to capture the whole image of this bathroom.
in spite of the size of the space, it had a big old vanity at the entrance.
i really really really....... hated this vanity.
also i wasn't happy with the color of the wall, tile work on the floor and how the toilet bowl sat at tiny space very backward of the room.
for me, everything in this room didn't seem to have any harmony.
not only the vanity, but also the mirror and even the light fixture were big for this tiny bathroom, and i felt like suffocated in this room.
o.k., i'll quit to complain about the old bathroom here.
=after=
i'm sorry that i wasn't able to capture a broader image to show you all the transformation.
because of the tininess of the room, my polaroid camera wasn't able to meet the purpose.
but i needed to take the picture of our new bathroom with a polaroid camera.
here's the list what we did for the new bathroom.
1, we painted the wall over with warm yellow.
2, we removed all the original tiny tiles and laid new 12"x12" tiles with gray grout.
3, we settled a completely new vanity and a faucet.
4, we installed a new light fixture.
5, we replaced an old toilet bowl to the new one.
6, we replaced almost all the hardware to the new ones.
so, the list means that we renewed almost all but a bathtub.
you can see the new tile work in the first picture above.
to your and my surprise, i cut tiles and laid them by myself!
as i wanted this bathroom look like the one in a hotel in italy, i chose everything here with the image of that.
and now i call this bathroom "little italy".
sometime later, when my husband takes some pictures of this bathroom with his capable wide angle lens for me, i'll show them to you, promise.
i really enjoyed remodeling the bathroom.
seeing the transformation day by day was so fun.
it took about 10 days, but we were ok with that long lasting annoyance of not being allowed to use the bathroom on the main floor. (we have another one in the basement.)
because we saved a lot of money!
though i don't know it would have cost if we had requested this renovation to a professional contractor, i'm sure we saved a lot.
we spent about $1400 for the new items and some necessary material, and that's it.
instead of the big saving, we worked very very hard for 10 straight days.
dosn't it sound so tiresome and fun? :))
talk to you soon about another new story!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment